Based on the consolidated document PAR / PET, MME sets the new transmission facilities to be auctioned or authorized by ANEEL.
Responsible for the bidding process for new transmission projects, ANEEL prepares documentation that makes up the writing - which is included in the "Technical Annex", elaborated by ONS. This attachment is of great importance because it defines all the characteristics and technical requirements that must be met by the entrepreneur, in order to ensure their performance when integrating to the BIPS.
In sequence, ONS verifies the compliance of the basic project of the facilities with the requirements in the technical annexes of the bidding documents and the ones contained in the Grid Procedures. This analysis is embodied in the document "Technical Opinion on analysis of the basic grid facilities compliance as effectively implemented", a document of great importance for the integration of new facilities to the BIPS. In 2012, the technical requirements for 21 lots of auctioned projects were defined, and a total of 71 compliance analysis of basic projects of new transmission facilities were held.
For the projects authorized, ONS produced that same year about 60 documents with the features and basic technical requirements of these facilities.
Altogether, the compliance of the characteristics of the basic facilities as effectively deployed for 68 transmission projects were approved in 2012.