On the 19th of October at 2:29 pm, the breaking of the connection of current transformer associated with the 345 kV busbar breaker of substation Samambaia caused an imbalance between supply and load on 345 kV busbars, resulting in the shutdown of various equipment and transmission lines of substation Samambaia, causing load cuts totaling 300 MW.
Main actions and measures implemented: