In 2013, the Plan of Expansion and Reinforcement in Basic Network (PAR) and the Annual Plan for Expansion and Reinforcement of Transmission Facilities of Basic Network (PAR / DIT) were issued, which present the extensions and reinforcements needed to preserve the adequate network performance and ensure the full functioning of the electricity market in the period 2014-2016.
A very important event this year was the completion of LER 2013, established by MME Ordinance No. 132 of 25.04.2013, an exclusive auction for wind farms with power supply starting from September 1, 2015 In this auction, ventures winners of generation could not depend on new transmission works or expansion, using only the clearance capacities of existing facilities. Thus, it was due to the ONS to determine the remaining margins of transmission capacity in the Basic and Frontier Network that will be available in 2015 to accommodate the flow of the generation of the new wind farms contracted. For this, the ONS drafted ONS Technical Note 096/2013: "Margins Ability Flow Generation for Basic and Frontier Network" later published by the MME.
Similar to previous cycles, the studies leading to the PAR and PAR-DIT are conducted under Special Groups that include the participation of all agents and the Energy Research Company (EPE). They are subsequently forwarded to the MME to be matched with the Transmission Expansion Program (PET) prepared by EPE. After this alignment, and proper validation by the MME, the proposed upgrades and reinforcements in the Main Grid and the DIT are consolidated in specific documents forwarded to Aneel, so that the processes for a concession or authorization of transmission facilities are started.
For the implementation of 166 projects proposed by PAR for the triennium 2014-2016 an investment of R $ 13 billion is estimated, with reference to the calculation of costs between the works available by ANEEL.
For the period 2014-2016 the extensions and reinforcements roughly correspond in new additions of transmission lines in the order of 11,000 km and 38,000 MVA of transformation capacity, shown in the table below. These values are the result of the addition of 53 new lines and 195 new manufacturing units:
TRANSMISSION LINES |
|
TRANSFORMERS | ||
Voltage (kV) | Total (km) |
|
Voltage kV (*) |
Total (MVA) |
800 | 4.280 |
|
800/765 | 9.650 |
500/525 | 3.032 |
|
500/525 | 15.685 |
440 | 66 |
|
440 | 2.210 |
345 | 104 |
|
345 | 1.383 |
230 | 3.950 |
|
230 | 9.491 |
Total | 11.432 |
|
Total | 38.419 |
It is noteworthy that in the PAR cycle, from the set of proposed projects, 78% of new extensions (lines and substations) and 90% of new reinforcements were indicated for the first time on this cycle, leaving a passive of 22% in extensions and 10% of reinforcements shown in previous cycles. Since the emission of the PAR until 31.12.2013, two new auctions occurred in 07/2013 and 13/2013, which successfully tendered 13 lots. Following the works that were displayed on PAR and which have already been auctioned, boty transmission lines (TL) and substations (SE) are presented:
TL 500 kV Itatiba - Bateias (SP/PR)
TL 500 kV Araraquara 2 - Itatiba (SP)
SB Santa Bárbara D’oeste - CER (-300,+300) MVAr (SP)
SB Itatiba - CER (-300,+300) MVAr (SP)
TL 500 kV Araraquara 2 - Fernão Dias (SP)
SB Fernão Dias 500/440 kV (SP)
TL 500 kV Marimbondo II - Campinas (SP)
TL 230 kV Barro Alto – Itapaci (second circuit) (GO)
TL 230 kV Russas II – Banabuiú (second circuit) (CE)
SB Maracanaú 230/69 kV (CE)
TL 500 kV Sobral III - Ibiapina II (CE)
SB Ibiapina II 500/230 kV (new yard of 500 KV) (CE)
TL 230 kV Curitiba Norte – Bateias (PR)
SB Curitiba Norte 230/138 kV (PR)
TL 230 kV Vila do Conde - Tomé-Açu (second circuit) (PA)
SB Tomé-Açu 230/138 kV (PA)
SB Castanhal 230/138 kV (new Yard of 138 KV) (PA)
SB Santa Maria 3 230/138 kV (new Yard of 138 kV) (RS)
TL 230 kV Santo Ângelo – Maçambará (second circuit) (RS)
SB Pinhalzinho 230/138 kV (SC)
TL 230 kV Foz do Chapecó – Pinhalzinho (two circuits) (RS/SC)
SB Ivinhema 2 230/138 kV (new Yard of 138 kV) (MS)
SB Feijó 230/69 kV (AC)
TL 230 kV Rio Branco – Feijó (AC)
SB Cruzeiro do Sul 230/69 kV (AC)
TL 230 kV Feijó - Cruzeiro do Sul (AC)
TL 500 kV Itabirito 2 - Vespasiano 2 (MG)
TL 230 kV Imperatriz - Porto Franco (second circuit) (MA)
TL 230 kV Coelho Neto - Chapadinha II (MA)
TL 230 kV Miranda II - Chapadinha II (MA)
SB Chapadinha II 230/69 kV (MA)
TL 230 kV Russas II - Aracati III (double circuit) (CE)
SE Aracati III 230/138 kV (CE)
TL in direct current ±800 kV between SE Xingu and Estreito, with 2092km (PA/MG)
Converter Station Xingu ±800 kV - 4.000 MW (PA)
Converter Station Estreito ±800 kV - 3.850 MW (MG)
Finally, among the major works proposed in this PAR for basic network, pending the grant, highlights are the following lines of transmission (LT) and substations (SE):
SB Realeza 230/138 kV
TL 230 kV Realeza – Foz do Chopim (PR)
SB Andirá Leste 230/138 kV (PR)
SB Paraíso 2 230/138 kV (MS)
TL 230 kV Paraíso 2 – Chapadão C2 (MS)
TL 500 kV Estreito – Fernão Dias (MG/SP)
TL 500 kV Araraquara 2 – Itatiba (SP)
SB Fernão Dias 500/440 kV (nova) (SP)
TL 500 kV Araraquara 2 – Fernão Dias (SP)
TL 500 kV Marimbondo 2 – Campinas (SP)
TL 440 kV Cabreúva – Fernão Dias (SP)
TL 345 kV Piratininga II - Bandeirantes (SP)
TL 230 kV Manoel da Nobrega – Henry Borden (SP)
SB Marechal Rondon 440/138 kV (SP)
SB Água Azul 440/138 kV (SP)
SB Domenico Rangoni 345/138 kV (SP)
SB Manoel da Nobrega 230/138 kV e 230/88 kV (SP)
SB Nova Iguaçu 500/138 kV – 2º AT (RJ)
SB Campos 345/138 kV – 4º AT (RJ)
SB Viana 345/138 kV – 4º AT (RJ)
TL 230 kV Itabira 5 – Itabira 2 C2 (MG)
TL 230 kV Irapé – Araçuaí 2 C2 (MG)
TL 230 kV Irapé – Janaúba (MG)
SB Itabira 5 500/230 kV (MG)
SB Braúnas 230/161/138 kV (MG)
SB Janaúba 3 230/138 kV (MG)
SB Timóteo 2 230/69 kV (new Yard of 69 kV) (MG)
TL 230 kV Itumbiara – Paranaíba C2 (GO)
TL 230 kV Trindade – Firminópolis (GO)
SB Várzea Grande 230/138 kV – 2º AT and 2 TR phase shifters 138 kV (MT)
Capacitor banks at SEs Coxipó (80 MVAr) and Várzea Grande (40 MVAr) (MT)
SB Paranatinga 500/230 kV (new Yard of 230 kV) (MT)
TL 230 kV Paranatinga – Canarana (MT)
SB Canarana 230/138 kV (MT)
SB Jaru 230/138 kV (new Yard of 138 kV) (RO)
SB Coletora 230/69 kV – 1x100 MVA (new Yard of 69 kV) (RO)
Capacitor bank at SEs Rio Branco 69 kV (15 MVAr) (AC), Porto Velho 69 kV (50 MVAr) (RO) and Abunã 138 kV (15 MVAr) (RO)
SB Xingu 500/230 kV (new sector 230 k
V) (PA)
TL 230 kV Altamira – Transamazônica C2 (PA)
TL 230 kV Transamazônica – Tapajós (PA)
TL 230 kV Xingu – Altamira (PA)
SB Tapajós 230/138 kV (PA)
TL 230 kV Integradora Sossego – Xinguara II C2 (PA)
TL 500 kV Vila do Conde – Marituba (PA)
SB Marituba 500/230/69 kV (PA)
TL 230 kV Marituba – Castanhal (PA)
TL 230 kV Marituba – Utinga C3 e C4 (PA)
SB Tomé Açu 230/138 kV (PA)
TL 230 kV Ribeiro Gonçalves – Balsas C2 (PI/MA)
TL 230 kV Oriximiná – Juruti CD (PA)
SB Oriximiná 500/230 kV (new sector 230 kV) (PA)
SB Juruti 230/138 kV (PA)
SB Jurupari 230/69 kV (new sector 69 kV) (PA)
TL 230 kV Chapadinha II – Miranda II (MA)
SB Chapadinha II 230/69 kV (MA)
TL 500 kV Miracema – Lajeado C2 (TO)
TL 230 kV Lajeado – Palmas CD (TO)
SB Palmas 230/138 kV (TO)
TL 500 kV Morro do Chapéu II – Sapeaçu (BA)
SB Morro do Chapéu II 500/230 kV (BA)
TL 230 kV Juazeiro da Bahia III – Juazeiro da Bahia II (BA)
SB Juazeiro da Bahia III 500/230 kV (BA)
TL 230 kV Ceará Mirim II – João Câmara II C2 (RN)
TL 500 kV Açu III – João Câmara III (RN)
TL 500 kV Açu III – Quixadá (RN/CE)
TL 500 kV Ceará Mirim II – João Câmara III C2 (RN)
With respect to Plan Expansion and Reinforcement in Other Transmission Facilities PAR-DIT, 2014-2016 cycle, we highlight the following proposed works breakdown by region of the geoelectric BIPS:
Synthesis of the Proposed Works | SE/CO | South/ MS | NNE |
Construction of new transmission lines (km) | - | - | 27 |
Re-enabling/reconstruction/reconductoring/sectioning of existing lines (km) | 550 | 32 | - |
instalation/substitution of transformers (MVA) | 555 | 21 | 155 |
Installation of capacitive reactive compensation (Mvar) | 390 | 60 | - |
Installation of input line (EL) | 22 | 24 | 24 |
Adequacy of busbars/bays | 43 | 2 | - |
Other adequacies and substitutions | 33 | 2 | 4 |
(*) Includes the new bays LT