Access to the Grid

In 2011 92 Access Opinions were issued and 68 Opinions were reviewed. These numbers were respectively 27% and 33% higher than those achieved in 2010. The 92 Access Opinions issued in 2011 were, respectively, for connection of:

  • 4 hydraulic power plants;
  • 2 thermal plants;
  • 5 wind farms;
  • 5 free consumers;
  • 55 distributors and
  • 2 international interconnections.

Also stands out the development of 469 Access Documents to enable the technical capability of enterprises to participate in Auction LER and A-3 of 2011 and, until December 31st 2011, issue 452 documents to enable participation in the Auction A -3, 2012.